首页> 外文会议>International Conference on the European Energy Market >How Much Electric Interconnection Capacities are Needed within Western Europe?
【24h】

How Much Electric Interconnection Capacities are Needed within Western Europe?

机译:西欧需要多少电动互连能力?

获取原文

摘要

Using a global cost-benefit analysis, this paper investigates the electric interconnection capacities necessary in 2025 for ten countries in Western Europe. In line with the European Climate and Energy Package, a high penetration of wind generation and a strong demand management are considered in this study. This paper shows that a 7-GW reinforcement in comparison to the business-as-usual interconnection scenario brings around 600 M{EUR}/year of net benefits. In fact, the increased transmission investment costs are largely offset by reduced investments in generating units and lower variable generation costs. This study also shows that the revenues from congestions in Western Europe are reduced by 1 G{EUR}/year following the interconnection upgrade, which highlights the issue of appropriate incentives to develop the necessary cross-border transmission lines in Europe.
机译:采用全球性成本效益分析,本文调查了西欧十个国家的2025年所需的电互连能力。符合欧洲气候和能源包,在这项研究中考虑了风力发电和强烈需求管理的高渗透性。本文展示,与商业和通常的互连场景相比,7 GW加固约为600米(EUR} /净福利年份。事实上,通过减少生成单位和降低的变量成本,增加的传输投资成本主要抵消。本研究还表明,在互连升级后,西欧拥堵的收入减少了1克(EUR} /年,这突出了在欧洲开发必要的跨境传输线路的适当激励措施的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号