首页> 外文会议>International conference on logistics, informatics and service science;LISS 2011 >THE INFORMATION CONSTRUCTION MANAGEMENT ABOUT INITIAL SUPPORT OF HIGH-SPEED RAILWAY TUNNEL IN LOESS REGION
【24h】

THE INFORMATION CONSTRUCTION MANAGEMENT ABOUT INITIAL SUPPORT OF HIGH-SPEED RAILWAY TUNNEL IN LOESS REGION

机译:黄土地区高速铁路隧道初始支持的信息化建设管理

获取原文

摘要

During the process of tunnel construction, it is very necessary to insist on the information construction management and take measures. Taking the Humaling tunnel as the background, mechanical properties of its typical cross section’s surrounding loess are comprehensive researched by in-situ monitoring and FEM calculation, and then explored the mechanical rules of the initial support for high-speed railway tunnel in loess . The initial support effects can be evaluated; meanwhile several corresponding optimization measures are put forward aiming at the weaknesses of the initial support process. Based on the above, some advices and techniques are provided for the initial support in the similar loess region.
机译:在隧道施工过程中,非常需要坚持信息化建设管理并采取措施。以胡麻岭隧道为背景,通过现场监测和有限元计算,综合研究了典型断面周围黄土的力学性能,并探讨了黄土高速铁路隧道初期支护的力学规律。可以评估最初的支持效果;同时针对初始支持过程的弱点提出了几种相应的优化措施。基于以上情况,为类似黄土地区的初步支持提供了一些建议和技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号