首页> 外文会议>International conference on offshore mechanics and arctic engineering;OMAE2008 >DESIGN OF THE WORLD'S 1st GRAVITY ACTUATED PIPE (GAP) FOR MURPHY'S KIKEH DEEPWATER DEVELOPMENT, EAST MALAYSIA
【24h】

DESIGN OF THE WORLD'S 1st GRAVITY ACTUATED PIPE (GAP) FOR MURPHY'S KIKEH DEEPWATER DEVELOPMENT, EAST MALAYSIA

机译:设计用于东非Murphy的深水开发的世界上第一个重力驱动管(GAP)

获取原文

摘要

MURPHY Sabah Oil Co. Ltd. has developed the Kikeh Field located offshore Malaysia in the South China Sea in a water depth of 1325m. This field development is based on a Floating Production Storage and Offloading unit (FPSO) and a Spar Dry Tree Unit (DTU). Fluids are transported in fluid transfer lines (FTL) using SBM's newly developed and patented Gravity Actuated Pipe (GAP) system.The GAP principle is based on a large diameter carrier pipe supporting a number of flow lines and a power/control umbilical. The carrier pipe serves as a structural support for the flow lines and umbilical. The flow lines are attached to the carrier pipe by supports allowing movement in the axial direction. The carrier pipe terminates at each end with a towhead, which channels the forces into the carrier pipe and supports flexible jumpers between the flowlines and the floating facilities. Tether chains are suspended from the floaters to support each end of the carrier pipe. Clump weights and buoyancy are mounted at the ends of the carrier pipe to generate vertical load. The action of the clump weights and buoyancy on the angled chains keeps the carrier pipe under tension. This tension minimizes the hog/sag deflections of the pipe bundle and keeps the system within acceptable limits.This paper presents a technical overview of the Kikeh FTL GAP system. Several challenging engineering and design aspects and their solutions are presented. Design of the GAP sub-components is highly interactive requiring significant hydrodynamic and structural analysis by experienced personnel.The Kikeh FTL GAP project commenced fabrication in 1 st quarter 2006, and completed installation and achieved first oil in August 2007.
机译:墨菲沙巴石油有限公司开发了位于南海马来西亚近海,水深1325m的Kikeh油田。该现场开发基于浮动产品存储和卸载单元(FPSO)和Spar干树单元(DTU)。使用SBM的最新开发并获得专利的重力驱动管(GAP)系统在流体传输线(FTL)中传输流体。 GAP原理基于大直径的输送管,该输送管支持多条流水线和一个电源/控制脐带。输送管用作输液管和脐带的结构支撑。流体管线通过允许沿轴向方向移动的支撑件固定在输送管上。输送管的两端分别带有一个牵引头,该牵引头将力引导到输送管中,并在流水线和浮动设施之间支撑挠性跳线。系链从浮子上悬挂下来,以支撑输送管的每一端。结块配重和浮力安装在输送管的末端,以产生垂直载荷。块状配重和浮力在成角度的链条上的作用使输送管保持张紧状态。该张力使管束的生猪/垂度偏差最小化,并使系统保持在可接受的范围内。 本文介绍了Kikeh FTL GAP系统的技术概述。介绍了一些具有挑战性的工程和设计方面及其解决方案。 GAP子组件的设计是高度交互的,需要经验丰富的人员进行大量的流体动力学和结构分析。 Kikeh FTL GAP项目于2006年第一季度开始制造,并已完成安装并于2007年8月获得了第一批石油。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号