Roadmapping is a powerful tool to manage technical risks and opportunities associated with complex problems. Roadmapping identifies technical capabilities required for both project- and program-level efforts and provides the basis for plans that ensure the necessary enabling activities will be done when needed. Roadmapping reveals where to focus further development of the path forward by evaluating uncertainties for levels of complexity, impacts, and/or the potential for large payback. Roadmaps can be customized to the application, a "graded approach" if you will. Some roadmaps are less detailed. We have called these less detailed, top-level roadmaps "mini-roadmaps". These miniroadmaps are created to tie the needed enablers (e.g., technologies, decisions, etc.) to the functions. If it is found during the mini-roadmapping that areas of significant risk exist, then those can be roadmapped further to a lower level of detail. Otherwise, the mini-roadmap may be sufficient to manage the project / program risk. Applying a graded approach to the roadmapping can help keep the costs down. Experience has indicated that it is best to do mini-roadmapping first and then evaluate the risky areas to determine whether to further evaluate those areas. Roadmapping can be especially useful for programs / projects that have participants from multiple sites, programs, or other entities which are involved. Increased synergy, better communications, and increased cooperation are the results from roadmapping a program / project with these conditions. And, as with any trip, the earlier you use a roadmap, the more confidence you will have that you will arrive at your destination with few, if any, problems. The longer the trip or complicated the route, the sooner the map is needed. This analogy holds true for using roadmapping for laying out program / project baselines and any alternative (contingency) plans. The mini-roadmapping process has been applied to past projects like the hydrogen gas generation roadmap and the subsurface contaminant focus area (SCFA), and it's basic form is being applied in the formulation of the '2012 Plan' at the Idaho National Engineering and Environmental Laboratory (INEEL). There are also plans to apply this process in the near future for other projects/programs.
机译:路线表是管理与复杂问题相关的技术风险和机会的强大工具。 RoadMapping识别项目和计划级努力所需的技术能力,并为确保必要的能够在需要时进行必要的有利活动的计划提供基础。路线贴图显示,通过评估复杂性,影响和/或大型回报潜力水平的不确定性,将进一步发展的路径进一步发展。路线图可以定制到申请,如果您愿意的“分级方法”。一些路线图较不明显。我们呼吁这些更少的详细的顶级路线图“迷你路线图”。创建这些Minio1Admaps以将所需的推动器(例如,技术,决策等)绑定到功能。如果在迷你路线贴图期间发现,存在重大风险的区域,那么这些可以进一步向较低的细节路线映射。否则,迷你路线图可能足以管理项目/程序风险。在路线贴图上应用分级方法可以帮助保持成本。经验表明,最好首先进行迷你路线表,然后评估风险区域以确定是否进一步评估这些区域。路线贴图对具有来自多个站点,程序或涉及的其他实体的参与者的程序/项目特别有用。增加协同作用,更好的通信和增加的合作是通过这些条件路由计划/项目的结果。与任何旅程一样,您使用路线图的前提是,您将越令人信心地抵达您的目的地,如果有的话,如果有的话。旅行越长或复杂的路线,需要越早需要地图。这种类比使用路线贴图来铺设计划/项目基线以及任何替代(应急)计划。迷你路线贴图进程已应用于过去的氢气生成路线图和地下污染物焦点面积(SCFA),并在爱达荷国家工程和环境的“2012年计划”的制定中应用了基本形式实验室(防晒霜)。还计划在不久的将来应用此过程,以便其他项目/计划。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号