首页> 外文会议>Waterpower conference >A Review of Non-Federal Hydropower Dams Removed Under FERC's Regulatory Authority
【24h】

A Review of Non-Federal Hydropower Dams Removed Under FERC's Regulatory Authority

机译:FERC的监管机构对非联邦水电大坝的审查

获取原文

摘要

Dam removal has become a subject of great public interest in recent years as many dams inAmerica are becoming old and no longer serve their original purpose. The dams at FERC'snon-federal hydropower projects are no exception. This review looks at eleven non-federalhydropower dams removed between 1963 and 1999. The dams discussed are arrangedchronologically by year of removal in a format that includes basic information about the dam,removal, and lessons learned. Dam removals of FERC-regulated hydropower projects are rareevents.
机译:近年来,拆除水坝已成为引起公众极大关注的主题,因为 美国正在变老,不再符合其最初的目的。 FERC的水坝 非联邦水电项目也不例外。这篇评论着眼于十一个非联邦国家 在1963年至1999年之间拆除了水电大坝。 按拆除年份的时间顺序排列,格式包括有关大坝的基本信息, 搬迁,以及汲取的教训。受FERC监管的水电项目的大坝拆除很少 事件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号