首页> 外文会议> >Project Uncertainty, Management Practice and Project Performance: An Empirical Analysis on Customized Information Systems Development Projects
【24h】

Project Uncertainty, Management Practice and Project Performance: An Empirical Analysis on Customized Information Systems Development Projects

机译:项目不确定性,管理实践和项目绩效:定制信息系统开发项目的实证分析

获取原文

摘要

This paper develops a risk-based integrated model of information systems development(ISD) project performance to explain the effect of project inherent uncertainty and management practices on project performance. Based on the dataset collected from customized information systems development projects of software houses in Hangzhou City of China, this paper carries out an empirical analysis on the research model. The results reveal that performance risk in development stage and performance risk in implementation stage are two intervening variables, which mediated the effects of project inherent uncertainty and management practices on both process and product performance. The findings suggest that management factors such as project planning and control, internal integration, user participation and top management support can improve project performance in the presence of project inherent uncertainty. In addition, the key influencing factors are found to be different in different project stages. Key influencing factors are project planning and control, internal integration and user participation in development stage. Key influencing factors are user participation and top management support in implementation stage. However, we have not found evidence for significant positive influence of process performance on product performance, which means that projects which come in within time and cost budgets may deliver poor systems.
机译:本文开发了一种基于风险的信息系统开发(ISD)项目绩效集成模型,以解释项目固有的不确定性和管理实践对项目绩效的影响。基于从中国杭州市软件企业定制信息系统开发项目中收集的数据集,本文对研究模型进行了实证分析。结果表明,开发阶段的绩效风险和实施阶段的绩效风险是两个中间变量,它们介导了项目固有的不确定性和管理实践对过程和产品绩效的影响。研究结果表明,在存在项目固有不确定性的情况下,诸如项目计划和控制,内部集成,用户参与和高层管理支持等管理因素可以提高项目绩效。此外,关键的影响因素在不同的项目阶段被发现是不同的。关键影响因素是项目计划和控制,内部集成以及开发阶段的用户参与。关键影响因素是实施阶段的用户参与和高层管理人员的支持。但是,我们还没有发现证据表明过程性能对产品性能有显着的积极影响,这意味着在时间和成本预算范围内进行的项目可能会交付较差的系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号