首页> 外文会议>International Welding/Joining Conference-Korea; 20070510-12; Seoul(KR) >Geometrical and Welding Conditions on Through-Thickness Residual Stress in Primary Piping of Girth Welded Joints
【24h】

Geometrical and Welding Conditions on Through-Thickness Residual Stress in Primary Piping of Girth Welded Joints

机译:环焊缝一次管道全厚度残余应力的几何和焊接条件

获取原文
获取原文并翻译 | 示例

摘要

Recently, stress corrosion cracking (SCC) of primary piping of stainless steel has been observed. SCC is considered to initiate and progress at near the welding zone in butt-welded pipes, because of the tensile residual stress introduced by welding. In present work, three-dimensional and axisymmetric thermo-elastic-plastic finite element analyses have been carried out, in order to clarify the effect of geometrical and welding conditions on through-thickness residual stress. In particular, butt-welding joints of SUS316L pipes have been examined. The residual stress was simulated by three-dimensional and axisymmetric models and the results were compared and discussed in detail.
机译:近来,已经观察到不锈钢的初级管道的应力腐蚀开裂(SCC)。由于焊接引入的拉伸残余应力,SCC被认为在对接焊管的焊接区附近开始并发展。在目前的工作中,已经进行了三维三维轴对称热弹塑性有限元分析,以阐明几何和焊接条件对贯穿厚度残余应力的影响。特别是对SUS316L管道的对焊接头进行了检查。通过三维和轴对称模型模拟了残余应力,并对结果进行了比较和详细讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号