IMPLEMENTING SAFETY CULTURE IN A DEVELOPING COUNTRY

机译:在发展中国家实施安全文化

获取原文
获取原文并翻译 | 示例

摘要

Angra 1 nuclear power plant is a 657 MW(e) PWR, located in Brazil, and designed by Westinghouse in the 1970s. Construction began in 1974 and commercial operation commenced in January 1985. At Angra, in order to solve any problems we use two basic safety concepts: safety cannot be underestimated, jeopardized or neglected and feedback experience, both in-house and external, shall be maximized. In this respect, several tools are being used: (a) A Total Quality Programme is being implemented with the participation of the majority of our employees. (b) An '5S' programme was established within the plant. (c) A self-assessment methodology is being applied in the Chemistry Section. (d) A re-engineering process is being applied involving three related areas - the Plant Technical Support Division, Site Construction Engineering, and Corporate Headquarters Engineering, (e) The Head of the Divisions within the Plant shall possess or should have possessed a Senior Reactor Operator (SRO) licence. (f) The Plant Manager and his deputy are present when an operator is requali-fied in the simulator. (g) A programme very similar to the well-known 'STAR' is being prepared for implementation in 1995. STAR stands for: Stop, Think, Act, Review. (h) A formal programme was established involving all the managers of the Divisions together with the Plant Manager, who simultaneously visit the plant every two weeks. (i) An independent Safety Group was created. One of its missions is the development of a plant specific Level 1 probabilistic safety assessment (PSA). (j) An Outage Group was formed permanently, with a SRO licenced engineer as manager. (k) Every operator who manipulates any control in the control room shall possess a valid RO or SRO licence. (1) The Shift Supervisor position is occupied by a qualified engineer with at least a BSc degree.
机译:安格拉1号核电站是一台657兆瓦(电)压水堆,位于巴西,由西屋公司于1970年代设计。 1974年开始建设,1985年1月开始商业运行。在安格拉,为了解决任何问题,我们使用了两个基本安全概念:不能低估,破坏或忽视安全性,应最大限度地利用内部和外部的反馈经验。 。在这方面,正在使用几种工具:(a)在我们大多数员工的参与下,正在实施全面质量计划。 (b)在工厂内建立了“ 5S”计划。 (c)化学科正在采用一种自我评估方法。 (d)正在应用涉及三个相关领域的重新设计过程-工厂技术支持部,站点建设工程和公司总部工程,(e)工厂内各部门的负责人应拥有或应该拥有高级职员反应堆运营商(SRO)许可证。 (f)当操作员在模拟器中重新合格时,工厂经理及其副手在场。 (g)正在准备一个与著名的“ STAR”非常相似的程序,以便在1995年实施。STAR的意思是:停止,思考,行动,审查。 (h)建立了一个正式计划,由各部门的所有经理与工厂经理共同组成,他们每两周同时访问工厂。 (i)建立了一个独立的安全小组。其任务之一是开发工厂特定的1级概率安全评估(PSA)。 (j)停机组已永久成立,由SRO许可的工程师担任经理。 (k)每个在控制室内操纵任何控制装置的操作员均应持有有效的RO或SRO许可证。 (1)班主任的职位由至少具有BSc学位的合格工程师担任。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号