ON OPERATION OF POWER PLANT WITH SILT LADEN WATER - CERTAIN PROBLEMS AND REMEDIES

机译:含沙量水的电厂运行中的某些问题和补救措施

获取原文
获取原文并翻译 | 示例

摘要

The operation and maintenance of the 6x115 MW capacity run-of-the-river indigenously developed hydro power plant on the river Chenab in Stage-Ⅰand Stage-Ⅱ respectively in 1987 and 1996, because of operation with heavily silt laden water has been experienced to be eventful and challenging, demanding various kinds of improvements, upgradation and refurbishments over these years to reduce the frequency of unscheduled breakdowns, complex time consuming repairs and resultant interruptions in power. The areas addressed to in the exercises for extensive improvements inter-alia include different parts of power plant system in respect of both water way parts as well as others such as cooling, drainage and dewatering circuits. This article attempts a consolidation of experience gamed from the events encountered so far including their related problems and the adopted solutions till date as well as those others in the pipe line.
机译:1987年和1996年,分别在第一阶段和第二阶段的Chenab河上的6x115 MW容量的河道本国开发的水力发电厂的运行和维护,因为经历了淤泥重载水的运行为了应对这些挑战和挑战,这些年来需要进行各种改进,升级和翻新,以减少计划外的故障,复杂的耗时维修以及由此导致的电源中断的频率。演习中要进行广泛改进的领域尤其涉及电厂系统的不同部分,涉及水路部分以及其他部分,例如冷却,排水和脱水回路。本文尝试结合迄今为止遇到的事件(包括与之相关的问题,直至目前为止所采用的解决方案)以及管道中的其他事件所获得的经验加以整合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号