首页> 外文会议>Innovate integrate amp; invigorate >A Preview of FAA-iCMM v2.0 Process Areas and Mapping Tables
【24h】

A Preview of FAA-iCMM v2.0 Process Areas and Mapping Tables

机译:FAA-iCMM v2.0过程域和映射表的预览

获取原文
获取原文并翻译 | 示例

摘要

This paper provides an overview of work in process in developing an organizational improvement model that integrates beyond capability maturity models. The Federal Aviation Administration integrated Capability Maturity Model (FAA-iCMM) version 1.0 is now being expanded to incorporate and integrated several additional models and standards beyond the systems engineering, acquisition, and software disciplines of its original source models. The process coverage of the proposed new model is summarized here, along with a mapping table that illustrates at a high level how 8 models and standards have been aligned to come up with FAA-iCMM v2.0.
机译:本文概述了开发超越能力成熟度模型的组织改进模型的过程中的工作。美国联邦航空管理局集成能力成熟度模型(FAA-iCMM)版本1.0现在正在扩展,以合并并集成其原始源模型的系统工程,购置和软件学科以外的其他几个模型和标准。此处总结了所提议的新模型的过程覆盖范围,以及一个映射表,该映射表在较高级别上说明了如何将8种模型和标准进行对齐以提出FAA-iCMM v2.0。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号