Methodology for priorization of research and development projects in the electrical sector

机译:优先考虑电力部门研发项目的方法

获取原文

摘要

As of May 2008, the responsibility for the selection and evaluation of Research and Development (R & D) projects of the program of the National Electric Energy Agency (ANEEL), has become the concessionaires of electric energy. In this sense it is observed the importance of an internal planning directed to coherent choices of the themes addressed in the projects. There is also a need for extreme care in managing them for the success of the program. The projects should be based not only on the criteria of the regulatory agency (ANEEL), which are essential for their development, but also on issues that are of great importance and cover not only the needs of the utility, but also the electricity sector as a whole. These are primarily intended to result in product and service improvements to internal and external customers. Considering this context, the article aims to provide electricity distributors in Brazil with the possibility of a more assertive choice of investments in the R & D / ANEEL program, through the methodology proposed in this article.
机译:截至2008年5月,国家电力局(ANEEL)计划中的研究与开发(R&D)项目的选择和评估的责任已成为电力的特许经营者。从这个意义上讲,可以观察到针对项目中所涉及主题的一致选择的内部计划的重要性。为了计划的成功,在管理它们时也需要格外小心。这些项目不仅应基于对其发展至关重要的监管机构(ANEEL)的标准,而且还应基于极为重要的问题,不仅要涵盖公用事业的需求,还应涵盖电力行业。整个。这些主要是为了改善内部和外部客户的产品和服务。考虑到这种情况,本文旨在通过本文中提出的方法,为巴西的电力分销商提供在R&D / ANEEL计划中更果断地选择投资的可能性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号