首页> 外文会议>Asian International Conference on Fluid Machinery; 20051012-15; Yichang(CN) >PUMP UNIT SELECTION IN EASTERN ROUTE OF SOUTH-TO-NORTH WATER DIVERSION PROJECT OF CHINA BASED ON RELIABILITY AND ECONOMY
【24h】

PUMP UNIT SELECTION IN EASTERN ROUTE OF SOUTH-TO-NORTH WATER DIVERSION PROJECT OF CHINA BASED ON RELIABILITY AND ECONOMY

机译:基于可靠度和经济性的南水北调东线工程水泵机组选择

获取原文
获取原文并翻译 | 示例

摘要

In the light of the characteristics of Eastern Route of South-to-North Water Diversion Project, the requirements of pump units of step pump stations of the project were analyzed. According to application situation of low head large pump unit and current technique level, reliability, maintainability, circumstance protection, investment, performance cost were all considered, step number, functions and flow cut-off ways of pump station were studied, reasonable capacity, pump type, motor type, axial type and key structures of the pump units were put forward in order to promote benefits of the project The results are well worth referencing to plan, equipment selection and operation maintenance of the project.
机译:根据南水北调东线工程的特点,分析了该工程阶梯泵站的泵组要求。根据低扬程大型泵机组的应用情况和目前的技术水平,综合考虑可靠性,可维护性,环境保护,投资,性能成本,研究了泵站的步数,功能和截流方式,合理的容量,泵为提高项目效益,提出了泵机组的型号,电机型号,轴向型号和关键结构,其结果值得项目计划,设备选型和运行维护参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号