首页> 外文会议>Annual North American Waste to Energy Conference(NAWTEC15); 20070521-23; Miami,FL(US) >Retrofit of Waste-to-Energy Stoker Controls to Improve Combustion and Availability
【24h】

Retrofit of Waste-to-Energy Stoker Controls to Improve Combustion and Availability

机译:改造垃圾转化为能源的烟囱控制装置,以改善燃烧和可用性

获取原文
获取原文并翻译 | 示例

摘要

This paper discusses the retrofit of the stoker grate hydraulic system and controls at Montenay's Montgomery County Pennsylvania Waste-to Energy Facility. Since commencing operations in 1991, the stoker grate system was plagued with operational disruptions caused by fusion of its moving grates. The existing hydraulic system was designed to control the movement of waste on the grate sections by maintaining constant velocity stoker grate movement and varying the length of time the grates were dormant between cycles of grate movement. The purpose of the retrofit was to improve grate operations by replacing the existing hydraulic system with a system capable of providing continuous stoker movement at variable velocities, eliminating the dormant cycle of the grate movement.
机译:本文讨论了蒙特纳伊州蒙哥马利县宾夕法尼亚州垃圾发电设施的炉排炉排液压系统和控制装置的改造。自1991年开始运营以来,the煤炉排系统一直受到移动炉排融合造成的运行中断的困扰。现有的液压系统被设计为通过保持恒定速度的ker煤炉排运动并改变炉排移动周期之间炉排处于休眠状态的时间长度来控制炉排截面上的废物运动。改造的目的是通过以能够以可变的速度提供连续的炉movement运动,消除炉排运动的休眠周期的系统代替现有的液压系统来改善炉排的运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号