The fuzzy system used for short-term load forecasting is put forward.Based on relationship,the available historical load data are divided into some groups.Fuzzy system is used to map these sample data.The amending of rules parameters by descent method makes the output of FS coinciding with the data of loads,and FS can forecast future loads.
展开▼