SELECTION OF TUNNEL ALIGNMENT AND CONSTRUCTION FOR THE SHEPPARD EAST LRT PROJECT IN TORONTO

机译:多伦多东轻快铁项目隧道对齐方式的选择和施工

获取原文
获取原文并翻译 | 示例

摘要

The project is an underground connection between the new LRT along SheppardrnAvenue with the existing Don Mills subway station. This underground portion consists ofrnone kilometer twin tunnels and station underneath Highway 404. This paper describesrnthe preliminary design selection of the tunnel alignment and construction. The tunnelrnwill be constructed by a combination of cut-and-cover and mined tunneling for the stationrnand highway crossing, respectively. Both sequential excavation and TBM methodsrnwere considered for the mined tunneling. Selection criteria included construction risksrnand settlement, ground improvement, cost, and schedule. Alternative TBM procurementsrnwere evaluated due to the tight construction schedule.
机译:该项目是沿SheppardrnAvenue的新轻轨与现有Don Mills地铁站之间的地下连接。该地下部分由一公里长的双隧道和404号高速公路下方的车站组成。本文描述了隧道路线和施工的初步设计选择。该隧道将分别由车站和公路交叉口的挖挖与开采隧道组合而成。连续掘进和TBM方法都被考虑用于采矿隧道。选择标准包括施工风险和解决,地面改善,成本和进度。由于施工进度紧迫,对替代的TBM采购进行了评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号