TUNNEL OF MOUTIER, SWITZERLAND: CHANGE FROM A TBM TO THE GERMAN EXCAVATION METHOD

机译:瑞士MOUTIER的隧道:从TBM转换为德国挖掘方法

获取原文
获取原文并翻译 | 示例

摘要

Located in the Jura Mountains in Switzerland, the tunnel of Moutier is a 1.2 km twinrntube highway tunnel. The excavation started with a shielded 11.70 m diameter TBM,rnbut the TBM became stuck in a geologically disrupted zone after 190 m-resulting inrnextraordinary consequences to the project. In order to free it, the top heading of thernTBM tube had to be completely excavated with conventional excavation methods asrnwell as a roadheader; the worst 100 m were executed using the German excavationrnmethod: a Sequential Excavation Method (SEM), where the TBM was pushed throughrnat a later time. The other tube was excavated using conventional methods as wellrnas a roadheader. This paper shows the reasons that led from a TBM to a SequentialrnExcavation Method (SEM).
机译:Moutier隧道位于瑞士的汝拉山脉,是一条1.2公里的twinrntube公路隧道。开挖始于受保护的直径为11.70 m的TBM,但在190 m导致该项目产生非凡后果之后,TBM仍卡在了地质破坏区中。为了释放它,必须使用常规的挖掘方法如rnheader完全挖掘rnTBM管的顶部。最坏的100 m是使用德国的开挖方法:顺序开挖方法(SEM)进行的,随后将TBM推入。使用常规方法挖掘另一根管子,例如掘进机wellrnas。本文显示了从TBM转向顺序挖掘法(SEM)的原因。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号