首页> 外文会议>2005 NASCC: the steel conference >BRIDGE ERECTION OVER CANADIAN ICEAND IN THE SWISS ALPS
【24h】

BRIDGE ERECTION OVER CANADIAN ICEAND IN THE SWISS ALPS

机译:在瑞士阿尔卑斯山的加拿大冰岛架桥

获取原文
获取原文并翻译 | 示例

摘要

For bridge erection in the extremely cold winters of the Canadian North, ice can sometimes be an ally. Icernhas frequently been used as a platform to support very heavy construction loads and is often the mostrneconomical method of bridge erection when suitable conditions prevail. The technique for building icernbridges is described. Topics covered also include site assessment, bearing capacity theory, and therninspection and maintenance of ice bridges. Examples of several steel bridges erected off the ice, illustraternthis method of construction.
机译:为了在加拿大北部极端寒冷的冬天架桥,有时冰会成为盟友。 Icern经常被用作支撑非常重的建筑负载的平台,并且在适合的条件下,通常是最经济的桥梁架设方法。描述了用于建造冰桥的技术。涵盖的主题还包括现场评估,承载力理论以及冰桥的检查和维护。冰上竖立的几座钢桥的例子说明了这种建造方法。

著录项

  • 来源
  • 会议地点 Montreal(CA);Montreal(CA)
  • 作者

    David Stringer;

  • 作者单位

    University of Manchester in England;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号