首页>
外国专利>
Construction method of landslide restraint pile and landslide restraint pile.
Construction method of landslide restraint pile and landslide restraint pile.
展开▼
机译:滑坡抑制桩和滑坡限制桩的施工方法。
展开▼
页面导航
摘要
著录项
相似文献
摘要
Problem to be solved: to provide a labor saving method to reduce the number of personnel, to improve the safety of the work, and to shorten the period of work, and to provide a method for the reduction of the number of workers, and the method to reduce the work time.A liner plate 1 laid along an excavated ground inner wall EWBottom concrete placed on excavated bottom EBThe reinforcement 3 is disposed at a predetermined distance from the inner wall surface of the liner plateA plurality of rod-shaped members 4 arranged at predetermined intervals inside the reinforcing barConcrete body 5 filled inside liner liner 1Consists ofOf a pair of upper and lower gauges having a similar lattice spacingBottom gauge 61 on bottom concrete surfaceUpper gauge 62 is above liner plateThe lattice of each other is arranged so as to overlap with the plane.The plurality of rod-shaped members 4 are filled in the space formed by the lattice and filled with the body concrete 5.Diagram
展开▼