首页>
外国专利>
CONSTRUCTION METOD FOR MAIN TOWER STRUCTURE OF CABLE STAYED GIRDIR BRIDGE HAVING AMUSEMENT FACILITIES
CONSTRUCTION METOD FOR MAIN TOWER STRUCTURE OF CABLE STAYED GIRDIR BRIDGE HAVING AMUSEMENT FACILITIES
展开▼
机译:电缆长梁桥主塔结构施工方法,具有娱乐设施
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a pylon 100 of a cable-stayed bridge, a rotating shaft 200 installed across the central portion of the pylon 100, and a game installed in the pylon 100 so that rotation is possible by the rotating shaft 200 A method for constructing a cable-stayed bridge including a facility (300), comprising the steps of: installing the pylon (100); The temporary vent 11 and the girder 10 are opened and installed, but a partial area of one side of the pylon 100 is secured so that the working space 31 of the equipment 30 for the installation of the amusement facility 300 is secured. Steps to install except; an amusement facility installation step of installing the amusement facility 300 by the equipment 30 in the work space 31; installing the temporary vent 11 and the girder 10 with respect to the working space 31; By presenting a method of constructing a cable-stayed bridge with an amusement facility, comprising the steps of: installing a cable 112 with respect to the pylon 100 and the girder 10, and dismantling the temporary vent 11 , by having a special function and landscape, it becomes a landmark of the area where the structure is installed and serves as a tourism product.
展开▼