首页> 外国专利> Cloth foundation, cloth foundation construction method, solid foundation construction method, and formwork used for the construction method

Cloth foundation, cloth foundation construction method, solid foundation construction method, and formwork used for the construction method

机译:布基础,布基础施工方法,实心基础施工方法和模板用于施工方法

摘要

To provide a foundation that is easy to construct, and also, reduces construction costs.SOLUTION: A continuous footing 10 includes a foundation portion 30. The foundation portion 30 includes a base portion 31 extending along a first direction 11, an intermediate portion 32 projecting upward from an upper surface 31A of the base portion 31 and extending along the first direction 11, a first rising portion 33 projecting upward from an upper surface 32A of the intermediate portion 32 and extending along the first direction 11, and a second rising portion 34 projecting upward from the upper surface 32A of the intermediate portion 32 and extending parallel to the first rising portion 33 along the first direction 11. An anchor bolt projects upward from a first upper surface 33A which is an upper surface of the first rising portion 33 and a second upper surface 34A which is an upper surface of the second rising portion 34. The anchor bolt fixes a column base metal fitting and a foundation. The column base metal fitting and the foundation fix a column. The foundation portion 30 supports a building body in the first rising portion 33 and the second rising portion 34.SELECTED DRAWING: Figure 2
机译:为了提供易于构造的基础,并且还降低了施工成本。展会:连续脚10包括基础部分30.基础部分30包括沿第一方向11延伸的基部31,中间部分32突出从基部31的上表面31a向上沿第一方向11延伸,第一上升部分33从中间部分32的上表面32a向上突出并沿第一方向11延伸,第二上升部分34从中间部分32的上表面32a向上突出并沿第一方向11平行于第一上升部33延伸。锚螺栓从第一上表面33a向上突出,第一上表面33a是第一上升部分33的上表面作为第二上升部分34的上表面的第二上表面34a。锚螺栓固定柱底座金属配件和基础。柱底座金属配件和基础固定柱。基础部分30在第一上升部分33和第二上升部分34中支撑建筑物。选择绘图:图2

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号