首页> 外国专利> Building energy optimization system with capacity market program (CMP) participation

Building energy optimization system with capacity market program (CMP) participation

机译:建筑能量优化系统具有能力市场计划(CMP)参与

摘要

An energy optimization system for participating in a capacity market program (CMP) includes one or more memory devices storing instructions, that, when executed on one or more processors, cause the one or more processors to receive a nominated capacity value, generate an objective function and one or more CMP constraints, wherein the one or more CMP constraints cause an optimization of the objective function with the CMP constraints to generate a resource allocation that reduces the load of the facility by the nominated capacity value in response to receiving the dispatch from the utility, receive the dispatch from the utility, optimize the objective function based on the nominated capacity value, the dispatch, and the one or more CMP constraints to determine the resource allocation, and control one or more pieces of building equipment based on the determined resource allocation.
机译:用于参与容量市场计划(CMP)的能量优化系统包括存储指令的一个或多个存储器设备,即在一个或多个处理器上执行时,导致一个或多个处理器接收指定容量值,生成目标函数和一个或多个CMP约束,其中,一个或多个CMP约束使得具有CMP约束的目标函数的优化,以产生资源分配,以响应于接收来自的调度,通过提名的容量值减少设施的负载。实用程序,从实用程序接收调度,基于指定容量值,调度和一个或多个CMP约束来优化目标函数,以确定资源分配,并根据所确定的资源控制一个或多个建筑设备分配。

著录项

  • 公开/公告号US11068821B2

    专利类型

  • 公开/公告日2021-07-20

    原文格式PDF

  • 申请/专利权人 JOHNSON CONTROLS TECHNOLOGY COMPANY;

    申请/专利号US201916294490

  • 发明设计人 MICHAEL J. WENZEL;MOHAMMAD N. ELBSAT;

    申请日2019-03-06

  • 分类号G05B17/02;G06Q10/06;H02J3/14;H04L12/24;H02J3/32;G06Q50/06;H02J3/38;H02J3;

  • 国家 US

  • 入库时间 2022-08-24 20:01:06

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号