首页> 外国专利> the bidding stage modularization feasibility assessment method of the decision system in the bidding process of construction work

the bidding stage modularization feasibility assessment method of the decision system in the bidding process of construction work

机译:建设工作招标过程中决策系统的招标阶段模块化可行性评价方法

摘要

The present invention is to review the bid feasibility by using a dedicated application for related data after the construction bid announcement, (1) ITB review step of reviewing the tender notice (ITB) announced by the construction client; (2) the initial investigation stage; (3) bid feasibility review stage; (4) a feed step; (5) preparation of technical bid (TP) and calculation of construction cost; It provides a decision-making system for the bidding stage of construction construction, characterized in that it comprises a Between steps (1) and (2), (G1) Based on the bidding notice (ITB) reviewed in step (1), major ITB review items including construction details and quantity are selected, filtered by ITB review criteria including risk and profitability, and a predetermined standard is passed. (2) provides a decision-making system for the bidding stage of the construction construction, characterized in that it includes; Between steps (2) and (3), (G2) Select the main initial investigation review items including detailed construction details and detailed quantities reviewed in step (2) above, filter by initial survey review criteria items including risk and profitability, and go to step (3) when the predetermined criteria pass It provides a decision-making system of the bidding stage of construction construction, characterized in that it includes; the second stage of the gate passing. Also, In the decision-making system of the construction bidding stage to review the bid feasibility by using the dedicated application for the relevant data after the construction bid announcement, categories including schedules, costs, and site characteristics; Detailed elements including time reduction, cost, and cash flow that are classified and linked under the category; Consists of including, The category and the detailed element provide a modular method for the initial bidding stage in the decision making system of the construction construction bidding stage, characterized in that each of the categories and the detailed elements are quantitatively quantified by numerically assigned a predetermined weight. together, The details are It is characterized in that it is selected as a specific value and modularized, Provided is a modularization method for the initial bidding stage in the decision making system of the construction construction bidding stage, characterized in that the weight and the specific numerical value are multiplied to become a weighted score. And in the decision-making system of the construction construction bidding stage to review the bid feasibility by using the dedicated application for the relevant data after the construction bid announcement, (1) a manufacturing shop selection step in which the preconditions including the sales of the manufacturing company and the factory size are input and the manufacturing company is selected; (2) a module condition input step of inputting module conditions including road width and turning angle; (3) a module constraint condition determining step of determining a final module condition by comparing the module conditions; (4) a module design step of deriving a free module list by creating a module list and applying module variables considering the ratio and size; Provides a bidding stage modularization method in the decision-making system of the construction construction bidding stage, characterized in that it comprises a After step (4), (5) a module list input step of inputting a BOQ (Bill of Quantity) for each free module list by combining the design quantity of the module corresponding part; (6) a production and transportation cost calculation step of calculating the module quantity and module production cost based on the BOQ (Bill of Quantity); It provides a method for modularizing the bidding stage in the decision-making system of the construction construction bidding stage, characterized in that it comprises a. And in the decision-making system of the construction construction bidding stage to review the bid feasibility by using the dedicated application for the relevant data after the construction bid announcement, (1) a manufacturing shop selection step in which the preconditions including the sales of the manufacturing company and the factory size are input and the manufacturing company is selected; (2) a module condition input step of inputting module conditions including road width and turning angle; (3) a module constraint condition determining step of determining a final module condition by comparing the module conditions; (4) a module design step of deriving a free module list by creating a module list and applying module variables considering the ratio and size; It is characterized in that it comprises a Wr : road width, θ: rotation angle, r : turning radius, L: module length, W: module width The modular condition provides a method for modularizing the bidding stage in the decision-making system of the construction construction bidding stage, characterized in that determined by the above formula. together, In the decision-making system of the construction bidding stage to review the bid feasibility by using the dedicated application for the relevant data after the construction bid announcement, (1) Function rearranging step of organizing functions including functional nouns and functional verbs according to cost classification items (CBS); (2) an idea addition step of adding an idea, which is an additional item according to a function, according to the cost classification item (CBS); (3) an idea evaluation step in which a quantitative value is assigned to each evaluation item including functionality, economic feasibility, safety, and environmental characteristics in a state in which a predetermined weight is assigned; (4) an alternative materialization step of presenting a plurality of alternatives by calculating a plurality of life cycle costs (LCC, life cycle cost) that can be compared according to the cost classification item (CBS); (5) a target determination step of determining an optimal alternative among the plurality of alternatives; Provides a VE decision-making system in the decision-making system of the construction bidding stage, characterized in that it comprises The step (4) is, It provides a VE decision-making system in the decision-making system of the construction bidding stage, characterized in that the performance is scored numerically based on the importance and the evaluation grade for each evaluation item.
机译:本发明是通过在施工投标公告之后使用相关数据的专用申请来审查BID可行性,(1)审查建筑客户宣布的招标通知(ITB)的ITB审查步骤; (2)初步调查阶段; (3)投标可行性审查阶段; (4)进料步; (5)制备技术投标(TP)和建设成本计算;它为施工结构的竞标阶段提供了一种决策系统,其特征在于它包括基于在步骤(1)中审查的竞标通知(ITB)之间的步骤(1)和(2),(G1)之间的ITB审核项目包括施工详细信息和数量,由ITB审核标准过滤,包括风险和盈利能力,并通过预定的标准。 (2)为施工结构的竞标阶段提供决策系统,其特征在于它包括;在步骤(2)和(3)之间,(G2)选择主要初始调查审查项目,包括在上述步骤(2)中审查的详细施工细节和详细数量,通过初始调查审查标准项目,包括风险和盈利能力,并转到步骤(3)当预定标准通过时,它提供了施工结构的触摸阶段的决策系统,其特征在于它包括;浇口的第二阶段。此外,在施工竞标阶段的决策系统中,通过使用施工出价公告后的相关数据的专用申请来审查BID可行性,包括计划,成本和现场特征的类别;详细的元素,包括在类别下分类和链接的时间减少,成本和现金流量;包括包括,类别和详细元素为施工施工竞标阶段的决策系统中提供了一种模块化方法,其特征在于,通过数值分配预定的,每个类别和详细元素都是数量地量化的重量。细节的特征在于,它被选择为特定值和模块化,提供了用于施工施工竞标阶段决策系统中的初始探测阶段的模块化方法,其特征在于重量和特定数值乘以重量分数。在建筑施工竞标阶段的决策系统中,通过使用施工出价公告后的相关数据专用申请来审查投标可行性,(1)制造商店选择步骤,其中包括销售的前提制造公司和工厂规模是投入的,并选择制造公司; (2)模块条件输入输入模块条件,包括道路宽度和转动角度; (3)模块约束条件确定通过比较模块条件来确定最终模块条件的步骤; (4)模块设计步骤通过创建模块列表和考虑比率和大小的模块变量来导出自由模块列表;提供施工施工竞标阶段的决策系统中的竞标阶段模块化方法,其特征在于它包括在步骤(4),(5)模块列表输入步骤,用于输入BOQ(数量)通过组合模块对应部分的设计数量来获取免费模块列表; (6)基于BOQ(数量清单)计算模块数量和模块生产成本的生产和运输成本计算步骤;它提供了一种用于模块化施工施工竞标阶段的决策系统中的探测阶段的方法,其特征在于它包括a。在建筑施工竞标阶段的决策系统中,通过使用施工出价公告后的相关数据专用申请来审查投标可行性,(1)制造商店选择步骤,其中包括销售的前提制造公司和工厂规模是投入的,并选择制造公司; (2)模块条件输入输入模块条件,包括道路宽度和转动角度; (3)模块约束条件确定通过比较模块条件来确定最终模块条件的步骤; (4)模块设计步骤通过创建模块列表和考虑比率和大小的模块变量来导出自由模块列表;它的特征在于它包括WR:道路宽度,θ:旋转角度,R:转向半径,L:模块长度,模块宽度模块化条件提供了一种模块化决策系统中的竞标阶段的方法施工施工竞标阶段,其特征在于由上述公式确定。在施工竞标阶段的决策系统中,通过使用施工出价公告后的相关数据的专用申请来审查BID可行性,(1)函数重新排列组织功能,包括功能名词和功能动词成本分类项目(CBS); (2)根据成本分类项(CBS),添加一个想法的思想添加步骤,这是根据功能的额外项目; (3)一种思想评估步骤,其中将定量值分配给每个评估项,包括在分配预定重量的状态下的功能,经济可行性,安全性和环境特征; (4)通过计算可以根据成本分类项目(CBS)可以比较的多种生命周期成本(LCC,生命周期成本)来呈现多个替代方案的替代材料化步骤; (5)确定多个替代方案中的最佳替代方案的目标确定步骤;在施工竞标阶段的决策系统中提供了一个VE决策系统,其特征在于它包括步骤(4),它在施工竞标阶段的决策系统中提供了VE决策系统,其特征在于,基于每个评估项目的重要性和评估等级来评分性能。

著录项

  • 公开/公告号KR20210075369A

    专利类型

  • 公开/公告日2021-06-23

    原文格式PDF

  • 申请/专利权人 주식회사 두올테크;

    申请/专利号KR1020190166341

  • 发明设计人 남주현;

    申请日2019-12-13

  • 分类号G06Q30/08;G06Q30/02;G06Q50/08;

  • 国家 KR

  • 入库时间 2022-08-24 19:50:26