首页> 外国专利> CSG and CSG method

CSG and CSG method

机译:CSG和CSG方法

摘要

PROBLEM TO BE SOLVED: To compact a CSG after compaction (compacting) when it takes a long time from adding and mixing cement and water to excavated soil material (locally generated material) to compaction (compacting). It suppresses the decrease in degree and suppresses the decrease in the strength of the structure. CSG includes unwashed excavated soil material, cement, water, and a coagulation retarder having the effect of delaying the coagulation reaction of cement. In the CSG method, the structure 101 is constructed by stacking CSGs in layers by repeating the steps of leveling and rolling the CSGs. [Selection diagram] Fig. 1
机译:要解决的问题:在压实后压实CSG(压实)在将水泥和水加入挖掘的土壤(局部产生的材料)以压实(压实)时进行压实(压实)。它抑制了程度的降低并抑制了结构强度的降低。 CSG包括未洗过的挖掘土壤材料,水泥,水和凝固缓慢,具有延迟水泥凝固反应的效果。在CSG方法中,通过重复平整和滚动CSG的步骤来构造结构101,通过堆叠层中的CSG构成。 [选择图]图1

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号