首页> 外国专利> Binding of slit trench in cliff or stony ground - pipes are arranged vertically in trench and holes bored through to be filled with concrete

Binding of slit trench in cliff or stony ground - pipes are arranged vertically in trench and holes bored through to be filled with concrete

机译:在悬崖或石质地面中绑定狭缝沟槽-管道垂直排列在沟槽中,并钻穿通孔以填充混凝土

摘要

Binding of a slit wall in a cliff or stony ground, which is overlaid with softer soil and where a slit is excavated in this softer soil and support fluid is introduced to fill the slit up to its top edge. Pipes are arranged vertically in the finished slit and holes are bored into the cliff through these pipes. Reinforcements or support elements are inserted into the holes and reach up to the top edge of the slit well. Concrete is then filled into the holes and trench so that concrete, trench and pile-shaped concrete block are connected with each other.
机译:在悬崖或石质地面上缝隙壁的结合,该峭壁或石质地面覆盖有较软的土壤,并且在此较软的土壤中开挖了一个缝隙,并引入了支撑液以填充该缝隙直至其顶部边缘。在完成的狭缝中垂直排列管道,并通过这些管道在悬崖上钻洞。钢筋或支撑元件被插入孔中,并到达缝隙井的顶部边缘。然后将混凝土填充到孔和沟槽中,以使混凝土,沟槽和桩状混凝土块相互连接。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号