首页> 外国专利> A method to secure the transfer of the control field of a central control to another central control of a telecommunication network. (Machine-translation by Google Translate, not legally binding)

A method to secure the transfer of the control field of a central control to another central control of a telecommunication network. (Machine-translation by Google Translate, not legally binding)

机译:一种确保将中央控制的控制域转移到电信网络的另一个中央控制的方法。 (通过Google翻译进行机器翻译,没有法律约束力)

摘要

A method for safely transferring the control field from a central control (when it ceases to function and being perceived safely, due to the same method) to another central control of a telecommunication network with which each control field it changes encoded control signals through at least three independent control lines, with an individual central control, characterized as follows: a) because the possibility of operation of each central control (ZS) is continuously supervised, individually, for each one of at least three detectors (D) in fixed connection with the central control (ZS) and operating independently of each other, each detector (D) giving an indication corresponding to the possibility of operating the respective central control (ZS); b) because the indications provided by the detectors (D) of a central control (ZS) are simultaneously applied to at least two switching stages (N) that operate independently of each other and dedicated to each of the central controls (ZS), being given by each switching stage (M) a signal that corresponds to most of the indications; c) because if the interruption in the central control (ZS) is indicated by the majority of the detectors (D) that supervise the central control (ZS), the control field (SB) initially controlled by the central control (ZS) that it has stopped working and is transferred through replacement control lines (EL) to another central control (ZS) by at least one transfer stage (U) connected in series with each of the switching stages (M), d) because the control of the field (SB) that was initially done by the central control (ZS) that stopped working is assumed by the other central control (ZS) as soon as the latter receives by most of the lines of Substitution Control (EL) correctly coded control signals. (Machine-translation by Google Translate, not legally binding)
机译:一种用于将控制域从中央控制(当由于相同的方法而停止工作并被安全感知时)安全地转移到电信网络的另一个中央控制的方法,通过该控制域,每个控制域至少通过它改变编码的控制信号三个具有独立中央控制装置的独立控制线,其特征如下:a)因为每个中央控制装置(ZS)的运行可能性都受到至少三个与固定连接的检测器(D)中的每个检测器的持续监控。中央控制器(ZS)并且彼此独立地操作,每个检测器(D)给出与操作各个中央控制器(ZS)的可能性相对应的指示; b)因为中央控制器(ZS)的检测器(D)提供的指示同时应用于至少两个彼此独立操作并专用于每个中央控制器(ZS)的开关级(N),由每个切换级(M)提供对应于大多数指示的信号; c)因为如果中央监督机构(ZS)的大多数检测器(D)指示中央控制机构(ZS)出现中断,则控制区域(SB)最初由中央控制机构(ZS)控制已停止工作,并通过与每个开关级(M),d)串联的至少一个传输级(U)通过备用控制线(EL)传输到另一个中央控制器(ZS),因为磁场的控制中央控制(ZS)最初由停止工作的中央控制(ZS)完成的(SB)由另一个中央控制(ZS)承担,只要后者由大多数替代控制(EL)线路接收到正确编码的控制信号。 (通过Google翻译进行机器翻译,没有法律约束力)

著录项

  • 公开/公告号ES418126A1

    专利类型

  • 公开/公告日1976-03-16

    原文格式PDF

  • 申请/专利权人 STANDARD TELEPHON UND RADIO A.G.;

    申请/专利号ES19730418126

  • 发明设计人

    申请日1973-08-23

  • 分类号H04B;

  • 国家 ES

  • 入库时间 2022-08-23 02:29:26

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号