首页>
外国专利>
Wide span bridge arch scaffolding erection - involves linking truss parts into lattices from base upwards and consolidating hinges
Wide span bridge arch scaffolding erection - involves linking truss parts into lattices from base upwards and consolidating hinges
展开▼
机译:大跨度桥梁拱形脚手架的安装-涉及将桁架部件从底部向上连接成网格并加固铰链
展开▼
页面导航
摘要
著录项
相似文献
摘要
The cantilevered centering scaffolding frame is for arched bridges covering wide spans. Each truss first has the bottom abutment-supported parts hoisted by crane and hinged to abutments (11), and firmly suspended. The adjacent bottom parts are all linked to form a three-dimensional lattice unit (10a). Adjoining parts are similarly introduced and suspended and hinged until the top is reached. Resultant hinged connections between individual truss parts are then made rigid with further fish-plates and struts.
展开▼