首页>
外国专利>
Marine pipeline installation appts. - is pulled by the lay barge and requires no separate energy except to drive a sparge
Marine pipeline installation appts. - is pulled by the lay barge and requires no separate energy except to drive a sparge
展开▼
机译:船舶管道安装装置。 -被躺船拉动,除了驱动喷射器外不需要其他能量
展开▼
页面导航
摘要
著录项
相似文献
摘要
A submarine pipeline installation appts. forms a ditch and lays generally rigid pipeline from a surface vessel in the ditch. The appts. has rigid frame that travels on the sea-bed and has a ditch forming arrangement on its underside. A series of aligned supportive surfaces on the upper side of the frame movably receive the pipe and guide is downwardly into the formed ditch. A towing arrangement connects the frame to the surface vessel. As the apparatus is towed the ditch is formed and the pipe laid in it in a continuous operation without the operative portions of the ditching arrangement having to straddle the pipeline. Since the appts. has no movable parts to form the ditch energy is not continuously wasted when the lay barge is idle or momentarily stopped.
展开▼