首页>
外国专利>
CONSTRUCTION METHOD UTILIZING SLUG PILE COMBINING TOGETHER CHRACTERISTICS OF SAND DRAIN CONSTRUCTION PROCESS AND OF PLAIN CONCRETE PILE CONSTRUCTION METHOD
CONSTRUCTION METHOD UTILIZING SLUG PILE COMBINING TOGETHER CHRACTERISTICS OF SAND DRAIN CONSTRUCTION PROCESS AND OF PLAIN CONCRETE PILE CONSTRUCTION METHOD
展开▼
机译:结合砂排水施工工艺与普通混凝土桩施工特点的桩桩施工法。
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE:To prevent the occurrent of an alkaline secondary pollution through the promotion of a hardening reaction, by a method wherein, in a soft ground treating process, aluminium sulfide or its salt is mixed with a slug for agitation, and the mixture is driven into the ground instead of a sand pile. CONSTITUTION:Aluminium sulfide or its salt is added to a slug for mixture, and a slug pile is formed in a soft ground by a conventional sand drain process, a vibro- floatation process, and other processes. Resulting from the addition of ammonium sulfide to the slug, a hydraulic reaction occurs rapidly, and the slug pile forms a support pile in a short time. At an initial process of a gelation, hydrogen sulfide is generated, and this prevents choking of gaps between slug particles through the aid of a large number of fine cavities in the slug, and improves water permeability. Additionally, this neutralizes alkalinity in the slug.
展开▼