首页> 外国专利> BUILDINGGIN METHOD FOR MAIN PILE OF SOIL CONCRETE PILE IN BULGE RETAINING WALL

BUILDINGGIN METHOD FOR MAIN PILE OF SOIL CONCRETE PILE IN BULGE RETAINING WALL

机译:挡土墙桩主桩的筑筑法。

摘要

PURPOSE:To arrange so that a main pile may be built into a soil concrete pile while an application job is being performed concurrently. CONSTITUTION:A main pile 3 is caused to descend while being applied with a lubricant 10 injected from a nozzle and then is embedded into a soil concrete pile 2. In this case, the main pile 3 is caused to be guided by a guide material if necessary. Thus the main pile 3 can be built in as desired.
机译:目的:进行布置,以便在同时执行施工作业的同时,将主桩建在土壤混凝土桩中。组成:在使主桩3下降的同时,施加从喷嘴喷出的润滑剂10,然后将其埋入土壤混凝土桩2中。在这种情况下,如果发生故障,则由导向材料引导主桩3必要。因此,可以根据需要内置主桩3。

著录项

  • 公开/公告号JPS5928702B2

    专利类型

  • 公开/公告日1984-07-14

    原文格式PDF

  • 申请/专利权人 HIROSE KOZAI SANGYO KK;

    申请/专利号JP19800021862

  • 发明设计人 HIROSE KANICHIRO;

    申请日1980-02-23

  • 分类号E02D5/20;E02D5/02;E02D7/00;E02D9/02;

  • 国家 JP

  • 入库时间 2022-08-22 09:30:22

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号