arrangement for stepwise successive forward of at least three sequence of exchanger construction or tragteilen

机译:至少三个交换器结构或tragteilen序列的逐步连续前进的布置

摘要

A method of advancing a plurality of longitudinally arranged movable constructional units forwardly successively in a self-running manner, wherein a plurality of prefabricated constructional units for construction of an underground structure of a form adapted for a special purpose such as tunnel excavation, heavy load transportation, underwater tunnel installation or muddy water dredging excavation are arranged along a common longitudinal line adjacent to each other and are provided with a forward advancement impelling mechanism, said mechanism comprising propulsion means positioned between the successive constructional units, a linking member extending over the entire length of the combined constructional units, impelling means and anchoring means arranged at respective certain locations on said linking member, and further with the necessary engineering facilities according to the employed purpose for construction, said method comprising actuating the first propulsion means to advance the forwardmost constructional unit through the length of one stroke, releasing the first propulsion means, actuating the other propulsion means successively to advance the intermediate and tailing constructional units successively each through the length of one stroke toward the advanced forwardmost constructional unit while utilizing the reaction forces of the other stationary constructional units which are summed up by the linking and anchoring means, and repeating such a procedure of the steps constituting one cycle a number of times until the constructional units arrive at a desired site of installation.P PAn apparatus for performing the above-described advancing method comprising propulsion means positioned between the said successive constructional units, a linking member serving the advancement of said units and arranged to pass from the forwardmost to the tailing constructional unit therethrough, anchoring members mounted at respective certain location of said linking member, and a set of equipments necessary for the supplemental engineering purpose.
机译:一种以自运行方式连续向前推进多个纵向布置的可移动建筑单元的方法,其中,多个用于构造地下结构的预制建筑单元的形式适合于特殊用途,例如隧道开挖,重载运输,水下隧道设施或泥水疏dr开挖沿彼此相邻的共同纵向线布置,并设有向前推进推动机构,所述机构包括位于连续结构单元之间的推进装置,在整个长度上延伸的连接构件组合的结构单元,推进装置和锚固装置中的一个布置在所述连接构件上的各个特定位置,并根据所采用的构造目的还具有必要的工程设施,所述方法包括致动第一推进装置前进最前面的结构单元经过一个冲程的长度,释放第一推进装置,依次致动另一个推进装置,以在利用反作用力的同时,将中间和尾部结构单元相继向前推进一个冲程的长度,朝着最先进的最前面的结构单元推进由连接和锚固装置累加的其他固定建筑单元中的至少一个,并重复构成一个循环的步骤的这种过程多次,直到建筑单元到达所需的安装位置为止。一种用于执行上述推进方法的设备,包括:推进装置,其位于所述相继的结构单元之间;链接构件,其用于使所述单元的前进,并布置成从最前端通过到尾部结构单元;锚固构件,分别安装在一定位置处。链接记忆的位置ber,以及补充工程目的所需的一套设备。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号