首页> 外国专利> METHOD FOR POSITIONING AND FIXING STAVE COOLER IN REPAIRING STAGE OF BLAST FURNACE WALL

METHOD FOR POSITIONING AND FIXING STAVE COOLER IN REPAIRING STAGE OF BLAST FURNACE WALL

机译:高炉墙修复阶段冷却壁的定位和固定方法

摘要

PURPOSE:To stably position and fix replacement type stave cooler to a blast furnace wall by utilizing cooling pipes for the stave cooler to position the stave cooler. CONSTITUTION:Positioning chains 5 are preliminarily attached to the replacement type stave cooler 4 and the cooling pipe 7 for passing the cooling water of the stave cooler 4 and basting bricks 8 for suppressing the quantity of the heat to be derived of from the furnace inside are cast therein. The existing iron shell and bricks are bored from the outside so that the pipings 7 and guide pipes 6 for positioning can be passed therethrough in the stage of attaching the stave cooler. The chains 5 are drawn to the outside of the furnace through the through-holes for the guide pipes and the guide pipes are attached to the iron shell, then the chains 5 are tensed and fixed to fixe the replacement type stave cooler 4. The spacings between the pipings 7 and the piping holes provided to the blast furnace shell 3 are hermetically sealed by welding.
机译:目的:通过利用冷却管冷却壁放置冷却壁,将替换型冷却壁冷却器稳定地定位并固定在高炉壁上。组成:定位链5预先安装在备用冷却壁冷却器4和冷却管7上,冷却壁7用于使冷却壁冷却器4的冷却水通过,而膨胀砖8用于抑制从炉内散发的热量。投在其中。现有的铁壳和砖块是从外部打孔的,以便在安装冷却壁的步骤中,用于定位的管道7和导管6可以从中穿过。链条5通过用于引导管的通孔被拉到炉子的外部,并且将引导管连接到铁壳上,然后将链条5张紧并固定以固定替换型冷却壁冷却器4。配管7与设置在高炉炉壳3上的配管孔之间的部分通过焊接而被气密密封。

著录项

  • 公开/公告号JPS6237303A

    专利类型

  • 公开/公告日1987-02-18

    原文格式PDF

  • 申请/专利权人 NIPPON STEEL CORP;

    申请/专利号JP19850177268

  • 发明设计人 YAMAMOTO MASATERU;

    申请日1985-08-12

  • 分类号C21B7/06;C21B7/00;C21B7/10;

  • 国家 JP

  • 入库时间 2022-08-22 07:25:50

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号