METHOD OF CUT OFF CONSTRUCTION OF OVERFLOW WATER BY CUT OFF CHEMICAL IN DEEP LAYER BORING HOLE

机译:深层钻孔切断化学物切断溢流施工方法。

摘要

PURPOSE: To surely cut off water by backfilling a recessed hole part deeply dug due to generation of leakage water with granular substance capable of being drilled by a drilling edge, and pouring a water cut-off chemical thereon by a capsule or an injection rod to form a consolidated layer. CONSTITUTION: After forming a recessed hole part 3 by deep digging due to generation of leakage water by a cracked position 2 of a boring pit 1, a drilling rod 4 is lifted, the recessed hole part 3 is backfilled with granular substance 5 having about 3-10 mm diameter and specific gravity about 1.2 or over such as glass balls or baked clay capable of being crushed by a drilling edge. Next a capsule 6 enclosed with a water cut-off chemical is brought down, and the water cut-off chemical is poured into the sedimentary layer of the granular substance 5 to form a consolidated layer with the substance 5 as aggregate. Of course when the cracked position 2 is positioned over the sedimentary layer of the substance 5, or even if it is covered with the sedimentary layer, the water cut-off chemical permeates the cracked position through the gap of the aggregate to blockade it. Next after confirming water cut-off, drilling is again performed.
机译:目的:通过回填因漏水而产生的深挖的深孔部分,以确保能够切断水,该粒状物质能够被钻缘钻出,然后通过胶囊或注入杆将防渗水剂倒入该部分中。形成合并层。构成:在由于钻孔1的裂开位置2产生漏水而通过深挖形成深孔部分3之后,抬起钻杆4,然后用大约3的粒状物质5回填该凹孔部分3。直径-10毫米,比重约为1.2或更高,例如玻璃球或能够被钻孔边缘压碎的烘烤粘土。接下来,放下用阻水剂封闭的胶囊6,并将该阻水剂倒入粒状物质5的沉积层中,以物质5作为聚集体形成固结层。当然,当裂化位置2位于物质5的沉积层上方时,或者即使其被沉积层覆盖,截水化学物质也会通过聚集体的间隙渗透裂化位置,从而将其阻塞。接下来,在确认了断水之后,再次进行钻孔。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号