首页>
外国专利>
METHOD OF CUT OFF CONSTRUCTION OF OVERFLOW WATER BY CUT OFF CHEMICAL IN DEEP LAYER BORING HOLE
METHOD OF CUT OFF CONSTRUCTION OF OVERFLOW WATER BY CUT OFF CHEMICAL IN DEEP LAYER BORING HOLE
展开▼
机译:深层钻孔切断化学物切断溢流施工方法。
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: To surely cut off water by backfilling a recessed hole part deeply dug due to generation of leakage water with granular substance capable of being drilled by a drilling edge, and pouring a water cut-off chemical thereon by a capsule or an injection rod to form a consolidated layer. CONSTITUTION: After forming a recessed hole part 3 by deep digging due to generation of leakage water by a cracked position 2 of a boring pit 1, a drilling rod 4 is lifted, the recessed hole part 3 is backfilled with granular substance 5 having about 3-10 mm diameter and specific gravity about 1.2 or over such as glass balls or baked clay capable of being crushed by a drilling edge. Next a capsule 6 enclosed with a water cut-off chemical is brought down, and the water cut-off chemical is poured into the sedimentary layer of the granular substance 5 to form a consolidated layer with the substance 5 as aggregate. Of course when the cracked position 2 is positioned over the sedimentary layer of the substance 5, or even if it is covered with the sedimentary layer, the water cut-off chemical permeates the cracked position through the gap of the aggregate to blockade it. Next after confirming water cut-off, drilling is again performed.
展开▼