首页> 外国专利> CONSTRUCTION METHOD FOR BUILDING OF STEEL FRAMED REINFORCED CONCRETE STRUCTURE

CONSTRUCTION METHOD FOR BUILDING OF STEEL FRAMED REINFORCED CONCRETE STRUCTURE

机译:钢构架钢筋混凝土结构的建筑施工方法

摘要

PURPOSE:To improve working efficiency by building in temporary stanchions for dead under a steel framed beam in the span direction, and assembling formworks such as floor, beam, and wall, while erecting a floor PC plate or a half PC plate on the bracket of the steel framed beam, or after erecting them. CONSTITUTION:Temporary stanchions 3 for dead are standingly provided under a steel framed beam 2, and a support 4 is standingly provided in the middle part between right and left temporary stanchions 3, 3 if necessary. Nextly, brackets 6 are welded in one body on the outside of vertical steel materials 2a of the steel framed beam 2, and half PC plates 5 are supported. Nextly, after completion of the set, formworks 8 are assembled on pillars 1, the beam 2, and walls 7. Simultaneously, an upper end reinforcement is arranged on the half PC plates 5, and after completion of these works concrete is integrally placed on the pillars 1, the walls 7, the beams 2, and the half PC plates 5. Hereby, as the works on the upper and lower stories can be performed simultaneously, building frame cycle process can be shortened.
机译:目的:通过在跨度方向上在钢框架梁下建造临时支柱以固定死者,并组装地板,梁和墙壁等模板,同时在地板的支架上安装地板PC板或半PC板,以提高工作效率。钢框架梁,或在安装后。构成:死者的临时支柱3竖立在钢制梁2的下方,必要时,在左右临时支柱3、3之间的中间竖立有支撑架4。接下来,将支架6一体地焊接在钢制框架梁2的垂直钢材2a的外侧,并且支撑半个PC板5。接下来,在完成布置之后,将模板8组装在支柱1,梁2和壁7上。同时,在一半的PC板5上布置上端加强件,并且在完成这些工程之后,将混凝土整体地放置在上面。支柱1,壁7,横梁2和半PC板5。因此,由于可以同时进行上层和下层的施工,因此可以缩短建筑周期。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号