首页> 外国专利> LINING CONSTRUCTION FOR TUNNEL IN SHIELD METHOD AND EQUIPMENT THEREOF

LINING CONSTRUCTION FOR TUNNEL IN SHIELD METHOD AND EQUIPMENT THEREOF

机译:盾构法隧道衬砌施工及其设备

摘要

PURPOSE:To carry out the primary and secondary lining constructions at the same time by execting the primary lining after assembling segments by a segment assembling device and repeating the secondary Lining by pouring concrete into between a mold frame and the segment behind the segment assembling device. CONSTITUTION:Lining construction is executed by installing a segment assembling device 14 behind an excavator 1, and a segment transporting device 16, dolley 17, mold frame transporting vehicle 21, mold frames 24, concrete 25, transporting device 40, and a concrete charger 47 behind the segment assembling device 14. In the process, segments are assembled and the primary lining is performed by the segment assembling device 14, and then concrete 25 is poured into between the mold frame 24 and a segment 13, and then the secondary lining is carried out, and removal is performed in succession from the mold frame 24 after the coagulation of concrete, and concrete 25 is poured again, and the secondary lining is repeated. Accordingly, the primary and secondary linings can be carried out at the same time.
机译:目的:通过分段组装装置组装分段后执行第一层衬砌,并通过将混凝土倒入模具框架和分段组装装置后面的分段之间,重复第二次衬砌,从而同时执行第一层和第二层衬砌施工。构成:衬砌施工是通过在挖掘机1的后面安装节段装配装置14,节段输送装置16,小车17,模架输送车21,模架24,混凝土25,输送装置40和混凝土装料机47来进行的在段组装装置14的后面。在该过程中,段被组装,并且由段组装装置14执行第一衬里,然后将混凝土25倒入模具框架24和段13之间,然后将第二衬里进行凝结后,依次从模具框架24上取下,再次注入混凝土25,并重复第二衬里。因此,可以同时进行一次和二次衬里。

著录项

  • 公开/公告号JPH03129099A

    专利类型

  • 公开/公告日1991-06-03

    原文格式PDF

  • 申请/专利权人 HITACHI ZOSEN CORP;

    申请/专利号JP19890265403

  • 发明设计人 NISHIDA SHOJI;TOMIKI HIROSHI;ABE TOMOHIRO;

    申请日1989-10-12

  • 分类号E21D11/10;E21D11/40;

  • 国家 JP

  • 入库时间 2022-08-22 06:04:17

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号