首页> 外国专利> Slag controlling process in a steelmaking blast converter

Slag controlling process in a steelmaking blast converter

机译:炼钢高炉转炉的炉渣控制工艺

摘要

In order to substantially avoid ejections of slag in slag practice in a blown steel converter (1) having a blowing lance (2), whose distance (a) from the bath surface (17) is controlled as a function of the sound level of the blowing noise measured through the slag at selected frequencies, the actual values of the sound level measured at the individual frequencies are combined to form a resulting characteristic value, the difference between this resulting characteristic value and a preset comparison value, which fixes a probable ejection on the basis of the sound level which can be allocated thereto, being determined and compared as a measure of an ejection probability with at least one preset probability limit, a correction of the blowing lance distance (a) or of the oxygen feed rate being made when the limit is exceeded. …IMAGE…
机译:为了在炉渣中基本上避免炉渣的排出,在具有吹喷枪(2)的吹炼钢转炉(1)中实践,其与熔池表面(17)的距离(a)根据炉膛的声级来控制。在选定的频率下通过炉渣测得的鼓风噪声,将各个频率下测得的声级的实际值组合起来,以形成最终的特征值,该最终特征值与预设的比较值之间的差将可能的喷射固定确定可以分配给其的声级的基础,并将其作为喷射概率的度量并与至少一个预设的概率极限进行比较,并在以下情况下对吹气枪距离(a)或氧气进给速度进行校正超出限制。 …<图像>…

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号