CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE HAVING LARGE SECTION AND SPLIT BLOCK USED FOR SAID STRUCTURE AND EXCAVATOR
CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE HAVING LARGE SECTION AND SPLIT BLOCK USED FOR SAID STRUCTURE AND EXCAVATOR
展开▼
机译:用于大型结构和挖掘机的具有大截面和大块砌块的地下结构施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: To construct an underground structure having a large section efficiently and economically. ;CONSTITUTION: Side drift sections 9A and 9B are constructed, and a guide section 13 of an excavator 10 is interlocked with a recess 1a of arch members 1 in the existing arch belt 3 to excavate a bedrock 20 in a state to reciprocate between side drift sections. New arch members 1 are erected in an arch type hollow 6 excavated and formed backward of the excavator 10 in a state to interlock the recess 1a of the arch members 1 in the arch belt 3 with a projection 1b of the new arch members 1, and a new arch belt is constructed. The central part 7 as the bedrock 20 of the insides of the constructed arch belts 3 is excavated. The constructed arch belts 3 are used for the body construction of a tunnel 5.;COPYRIGHT: (C)1993,JPO&Japio
展开▼