首页> 外国专利> FILLING METHOD FOR EARTH RETAINING WALL CONSTRUCTION WORK

FILLING METHOD FOR EARTH RETAINING WALL CONSTRUCTION WORK

机译:挡土墙施工工程的填方方法

摘要

PURPOSE: To prevent the deformation of an earth retaining wall. ;CONSTITUTION: A columnar consolidating material row 2 is prepared by the second CDM construction method using an ultra-retarder, so as to be adjacent to a columnar consolidating material group 1 prepared by the CDM construction method, and an earth retaining wall 3 is constructed in the row 2 by the SMW construction method. Alternatively, the group 1 is prepared, so as to be adjacent to the row 2 and the wall 3 is constructed in the row 2. Otherwise, the wall 3 is constructed in the row 2 and, then, the group 1 is prepared.;COPYRIGHT: (C)1995,JPO
机译:目的:防止挡土墙变形。 ;组成:柱状固结材料排2是通过第二种使用超级缓凝剂的CDM施工方法制备的,与CDM构造方法制备的柱状固结材料组1相邻,并建造了挡土墙3按SMW构造方法排在第2行。或者,准备组1,使其与行2相邻,并且在行2中构造壁3。否则,在行2中构造壁3,然后,准备组1。版权所有:(C)1995,日本特许厅

著录项

  • 公开/公告号JPH07158057A

    专利类型

  • 公开/公告日1995-06-20

    原文格式PDF

  • 申请/专利权人 CHEM GROUTING CO LTD;

    申请/专利号JP19930305176

  • 申请日1993-12-06

  • 分类号E02D5/18;

  • 国家 JP

  • 入库时间 2022-08-22 04:23:43

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号