首页>
外国专利>
SUSPENDED PROTECTION WORK AND SOIL SAVING DAM WITH SUSPENDED PROTECTION WORK
SUSPENDED PROTECTION WORK AND SOIL SAVING DAM WITH SUSPENDED PROTECTION WORK
展开▼
机译:暂停的保护工作和带有暂停的保护工作的土壤修复工程
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To promote protection efficiency of a soil saving dam in swamp, valley, etc. SOLUTION: A suspended protection work, in swamp or valley, etc., G, constructs foundation columns on both sides of G, a stone storage cage 2 is built between the lower parts of both foundation columns 1, main ropes 4 are stretched between the upper parts of both foundation columns 1 to hang a plurality of vertical steel materials 5 at specific intervals and, at the same time, a plurality of horizontal ropes 6 are stretched between both sides of the foundation columns 1 at vertically specific intervals to suspend protection works 10 for supporting the hanging vertical steel materials 5. Then, in a dam, the stone storage cage is built on a floor concrete of an overflow section, the main ropes are stretched between the upper parts of both sides of the overflow section to suspend a plurality of hanging vertical steel materials at specific intervals and, at the same time, a plurality of horizontal ropes are stretched between both sides of the overflow section at vertically specific intervals to suspend the protection works 20 for supporting the hanging vertical steel materials.
展开▼