首页>
外国专利>
Procedure for construction of a superstructure and ballastless track superstructure via built following the procedure.
Procedure for construction of a superstructure and ballastless track superstructure via built following the procedure.
展开▼
机译:按照以下步骤建造上部结构和无ball轨道上部结构的程序。
展开▼
页面导航
摘要
著录项
相似文献
摘要
FOR DEVELOPMENT OF A track superstructure APPLIED ON substructure 2, consisting of concrete, a layer 3 SUPPORT OF ASPHALT AND ON THIS STANDING sleepers 5 showing on the underside A DUMP 4 medium. TO ENSURE THE WICKED 5 against the transverse force ADAPTATION TO ENSURE ACCURATE AND ANCHOR WEAR A FREE, THE WICKED 5 show a bore 8 MEDIA and substructure a hole 9 OF SACO. DRILLING IN 9TH SACO APPLY GLUE AND THEREFORE AN USED IN DRILLING 9 OF SACO A TACO 13, which is guided through a bushing 11 DISTANCE AND SLIDING SET FORTH IN DRILLING 8 OF THE WICKED.
展开▼