(57) Abstract This invention is something regarding steam power field, both of the steam turbine power plant of re-heating die and fault re-heating die is active ones the case of the adjustment with the introduction of addition steam re-heating. Summary of this invention is as follows. The offering/accompanying water supply heating pump and the low pressure cylinder with 4 which are jointed the re-air heater by bypass line 8 of the aforementioned re-air heater 5 which possesses 5 which is jointed boiler 1 and high tension and medium pressure, by the turbine and that turbine and the pipe arrangement 6,7 which consist of the low pressure cylinder 2,3,4 and valve 9 and generator 10 and condenser 11 and water pump 12 and aforementioned boiler 1 and pipe arrangement 14 and bypass line 8 in pipe arrangement 7 distribution facilities the steam mixer 15 which is done and bypass line 8 and with re-air heaters 5 in pipe arrangement 6 distribution facilities the steam turbine which has with the valve 16 which is doneIn the power plant, the cool steam where the case of operating condition of rated other steady states, the high tension cylinder it comes out 2 and the intermediate cylinder 3 is divided by two currents, these two flow is distributed by valve 9,16 and is as follows sent. The 1st flow of 90 - 50% tonnage inside the steam current which comes out of the turbine was sent to bypass line 8, with the cool steam current where 10 - 50% currents other than that were sent by re-air heater 5, with largest pressure 0.1 - 1MPa were heated to temperature 650 - the 850 in that re-air heater 5, that the steam current which re-is heated and the bypass were done being combined, it becomes one steam, current after being mixed inside steam mixer 15, it is supplied to the turbine. As for this invention, it is efficiency of the steam turbine power plant and something which improves reliability by designating the moisture content expansion process inside the turbine in lastly as zero.
机译:(57)<摘要>本发明是关于蒸汽动力领域的,在引入附加蒸汽再加热进行调节的情况下,再加热模具的蒸汽轮机装置和故障再加热模具均处于活动状态。 。本发明的概述如下。通过上述再热式加热器5的旁通管线8将再热式加热器与供气/伴随供水加热泵和带有4的低压缸连接,该再热式加热器5具有连接锅炉1且高压和中压的5,通过涡轮机,该涡轮机和管道装置6,7由低压缸2,3,4和阀9以及发电机10和冷凝器11以及水泵12以及上述锅炉1和管道装置14以及旁通管路8组成在管道布置7的分配设施中,已完成的蒸汽混合器15和旁通管线8以及在管道布置6的分配装置中具有再加热加热器5的蒸汽轮机具有已完成的阀门16。在额定其他稳态的工况下,高压缸2出来,中间缸3被两个电流分流,这两个流量由阀9,16分配,如下已发送。从涡轮机出来的蒸汽流中的90%至50%吨位的第一股流被送至旁路管线8,其中冷蒸汽流(其中的10-50%电流不是由再热加热器5发送)通过在该再空气加热器5中,将最大压力0.1〜1MPa加热至温度650〜850,再加热后的蒸气流与旁通管合为一体,成为蒸气,在蒸气混合机内混合后成为电流。在图15中,将其供应给涡轮。对于本发明,通过最后将涡轮内部的水分扩展过程指定为零来提高蒸汽涡轮发电站的效率并提高可靠性。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号