首页> 外国专利> Construction method of nuclear reactor reinforced concrete containment vessel and diaphragm floor structure of nuclear reactor reinforced concrete containment vessel

Construction method of nuclear reactor reinforced concrete containment vessel and diaphragm floor structure of nuclear reactor reinforced concrete containment vessel

机译:核反应堆钢筋混凝土安全壳的建造方法和核反应堆钢筋混凝土安全壳的隔板底板结构

摘要

In a method of construction of a reinforced concrete diaphragm floor of a nuclear reactor reinforced concrete containment vessel, a bottom surface of the diaphragm floor is provided in the form of an iron plate. The iron plate, an iron bar beam portion for supporting the load provided by concrete during a concrete pouring time, and a reinforcing bar member to be buried in the concrete of the diaphragm floor are assembled outside of a building in which the nuclear reactor is to be embodied. The above members are carried using lifting machinery and are set in a permanent receiving member which is provided on both a main body of the nuclear reactor pressure vessel and a steel member serving as a concrete mold frame of an outer wall of the nuclear reactor reinforced concrete vessel. A concrete pouring is carried out in stages so as to form successive layers of concrete during plural pouring times. After a first concrete layer has completed and the strength of the concrete layer has been established after hardening, the second concrete layer is poured on the first layer, which aids in supporting the weight of the poured concrete.
机译:在核反应堆钢筋混凝土安全壳的钢筋混凝土隔膜底板的构造方法中,隔膜底板的底面以铁板的形式设置。铁板,用于支撑在混凝土浇筑期间由混凝土提供的载荷的铁杆梁部分,以及将被埋在隔膜地板的混凝土中的加强杆构件被组装在核反应堆所要建造的建筑物的外部。被体现。上述构件是用起重机械搬运的,并设置在永久接收构件中,该永久接收构件设置在核反应堆压力容器的主体和用作核反应堆增强混凝土外壁的混凝土模架的钢构件上船只。分阶段进行混凝土浇筑,以便在多个浇筑时间内形成连续的混凝土层。在完成第一混凝土层并在硬化后确定混凝土层的强度之后,将第二混凝土层倒在第一层上,这有助于支撑注入的混凝土的重量。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号