首页> 外国专利> CONTROL OF FURNACE CONDITION AT STOPPING TIME OF BLASTING IN BLAST FURNACE AND JIG FOR PLUGGING COAL WASTE

CONTROL OF FURNACE CONDITION AT STOPPING TIME OF BLASTING IN BLAST FURNACE AND JIG FOR PLUGGING COAL WASTE

机译:高炉装煤废料高炉及爆破停炉时炉内条件的控制

摘要

PROBLEM TO BE SOLVED: To recover the furnace condition in a comparatively short term at the starting time of the furnace by restraining the cooling of the furnace body during stopping the blasting to the min. limit. ;SOLUTION: In a method for controlling the furnace condition at the stopping time of blasting in the blast furnace, the inner pressure in the furnace near a tuyere in the blast furnace under stopping state of the blasting is measured, the difference ΔP between the inner pressure and the top pressure in the furnace is obtained and a furnace top bleeder is closed when the pressure difference ΔP in the furnace exceeds a control value, and further, a furnace top manhole is opened. A jig for plugging coal waste is provided with a shut-off disk for plugging a blasting branch tube, a hollow tube for penetrating the shut-off disk and opening at the tuyere side and a pressure gage connected with the outside end part of the hollow tube so as to measure the pressure in the surroundings of the tuyere with the pressure gage. The invasion of outer air caused by the rising of the pressure difference ΔP in the furnace is restrained and the excessive cooling of the furnace body is not developed.;COPYRIGHT: (C)2000,JPO
机译:解决的问题:在爆破停止期间,通过限制炉体的冷却,在炉子启动时以相对较短的时间恢复炉子状态。限制。 ;解决方案:在一种控制高炉中鼓风停止时炉膛状态的方法中,测量在鼓风停止状态下高炉风口附近炉内的内部压力,其内部之间的差ΔP当炉中的压力差ΔP超过控制值时,获得炉中的最大压力和炉顶压力,并且关闭炉顶放气器,并且进一步打开炉顶检修孔。用于堵塞煤waste石的夹具设置有:用于堵塞爆破分支管的关闭盘;用于穿透关闭盘并在风口侧开口的中空管;以及与中空部的外端部连接的压力计。用压力计测量风口周围的压力。抑制了炉内压力差ΔP的上升所引起的外部空气的侵入,并且炉体没有过度冷却。COPYRIGHT:(C)2000,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号