首页> 外国专利> Automatic project plan scheduling method involves adjusting deadline for completing project, based on available resources

Automatic project plan scheduling method involves adjusting deadline for completing project, based on available resources

机译:自动项目计划计划方法涉及根据可用资源调整完成项目的截止日期

摘要

The method involves scheduling a project plan based on various factors associated with the project. The deadline for completing project is adjusted, based on the available resources. An independent claim is also included for a digital processing unit for scheduling a project plan.
机译:该方法涉及基于与项目相关联的各种因素来计划项目计划。根据可用资源调整完成项目的截止日期。还包括用于计划项目计划的数字处理单元的独立权利要求。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号