首页> 外国专利> Wall construction for the protection of buildings from vibration and element for the production of the wall structure

Wall construction for the protection of buildings from vibration and element for the production of the wall structure

机译:用于保护建筑物免受振动影响的墙结构以及用于墙结构的生产要素

摘要

Two concrete walls (4,5) are installed both sides of an air gap and (5) arranged between the vibration source (3) and the building (2). The foot of the air gap is sealed off against water and/or ground entry and the wall sides facing the gap are deflected horizontally. The concrete elements form part of a diaphragm wall whose inserted piling walls (6) define the air gap. The air gap is formed during the pouring process by shuttering which closes off the ends of the diaphragm wall and is fixed to the end piling wall planks. Additional components include spacer bars (8) to keep the pile walls apart and secure the air gap. The shuttering extends right over the wall height ready for the concrete pouring operation etc. The shuttering is moved on to the next sector, maintaining the air gap right the way through the wall.
机译:两个混凝土墙(4,5)安装在气隙(5)的两侧,并布置在振动源(3)和建筑物(2)之间。气隙的脚被密封,以防止水和/或地面进入,并且面向气隙的壁侧水平偏转。混凝土元件构成隔板壁的一部分,隔板壁的插入的隔板壁(6)限定了气隙。气隙是在浇铸过程中通过关闭隔板壁的端部并固定在端部桩壁木板上的挡板形成的。其他组件包括隔离条(8),以保持桩壁分开并确保气隙。模板在整个墙壁高度上延伸,以准备进行混凝土浇筑等。模板移至下一个扇形区域,从而保持气隙一直穿过墙壁。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号