首页> 外国专利> Flow regulation and hydroelectric power system has several identical hydroelectric power stations arranged in sequence in direction of water flow outside shipping channel in boundary area

Flow regulation and hydroelectric power system has several identical hydroelectric power stations arranged in sequence in direction of water flow outside shipping channel in boundary area

机译:流量调节和水力发电系统具有多个相同的水力发电站,这些水力发电站在边界区域中沿船运通道外部的水流方向依次排列

摘要

The system consists of several identical hydroelectric power stations (1) in sequence in the direction of water flow. The stations are arranged only in a part of the flow cross-section of the flowing water, e.g. outside the shipping channel (2) in the boundary area. The energy conversion reduces the flow rate of a relatively small, partial region and reduces the overall flow rate by a defined amount after mixing the reduced and unaffected flows.
机译:该系统在水流方向上依次包含几个相同的水力发电站(1)。这些站仅布置在流动水的流动横截面的一部分中,例如在水流中。在边界区域的运输通道(2)外部。能量转换将相对较小的局部区域的流量降低,并且在将减少的流量和未​​受影响的流量混合后,将总流量降低一个确定的量。

著录项

  • 公开/公告号DE10021649A1

    专利类型

  • 公开/公告日2001-11-15

    原文格式PDF

  • 申请/专利权人 KRAMER PAUL;

    申请/专利号DE20001021649

  • 发明设计人 KRAMER PAUL;

    申请日2000-05-04

  • 分类号E02B9/00;E03B3/02;F03B13/10;

  • 国家 DE

  • 入库时间 2022-08-22 00:27:49

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号