首页> 外国专利> Method for starting and updating topology of electricity substation, comprises topological compilation, production of partial graphs for measuring units and complete graphs by centralisation unit

Method for starting and updating topology of electricity substation, comprises topological compilation, production of partial graphs for measuring units and complete graphs by centralisation unit

机译:用于启动和更新变电站拓扑的方法,包括拓扑编译,测量单元的局部图和集中单元的完整图的生成

摘要

A basic electrical configuration diagram for the substation is obtained from component, linkage and access data. The information is attributed to peripheral measuring (DFU) and centralisation (CU) units. Compiled diagram and attribution topologies are developed and partial graphs for each peripheral measuring unit are produced depending on component states Complete graphs are calculated for the centralisation units using superimposition algorithms
机译:可从组件,链接和访问数据中获取变电站的基本电气配置图。该信息归因于外围测量(DFU)和集中(CU)单位。制定编译图和属性拓扑,并根据组件状态生成每个外围测量单元的局部图,使用叠加算法为集中单元计算完整图

著录项

  • 公开/公告号FR2817045A1

    专利类型

  • 公开/公告日2002-05-24

    原文格式PDF

  • 申请/专利权人 ALSTOM;

    申请/专利号FR20000014851

  • 发明设计人 CARRILLO JEAN JACQUES;

    申请日2000-11-17

  • 分类号G01R31/08;G06F7/00;

  • 国家 FR

  • 入库时间 2022-08-22 00:24:16

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号