首页> 外国专利> COST ESTIMATE METHOD FOR CONSTRUCTION PROJECT USING HISTORICAL COST DATA AUTO COST ESTIMATE SYSTEM AND MEDIUM STORING A COMPUTER PROGRAM FOR PERFORMING THERE

COST ESTIMATE METHOD FOR CONSTRUCTION PROJECT USING HISTORICAL COST DATA AUTO COST ESTIMATE SYSTEM AND MEDIUM STORING A COMPUTER PROGRAM FOR PERFORMING THERE

机译:利用历史成本数据自动成本估算系统和介质存储计算机程序来执行的建设工程成本估算方法

摘要

PURPOSE: A method and system for estimating project expenses for a construction project using results data are provided to estimate an equipment cost and a construction cost at a project planning stage by converting expenses of a previous similar project into the current project expenses based on a results data of a previous construction project and correcting a time and a unit capacity. CONSTITUTION: If a project is selected out of a plurality of previous project results(S301), estimation information of the selected project is copied(S302). If at least one previous project result is selected, a weighted average value of a labor and a price according to each process is calculated from project result data of the selected project, and a project expenses application price database is created(S303). A basic estimation database is created by adding the copied estimation information of the selected project to the project expenses application price database. The created basic estimation database is corrected collectively adapted to requested contents and a characteristic(S304). After completing the correction, if the estimation data are different from new project, the estimation data are deleted, appended, or replaced(S305). A specification of a device is replaced, and an equipment cost is executed(S307). A construction cost is correct with respect to an item related to a construction only, and a construction cost is estimated(S308). An indirect cost is correct out of a construction project expenses(S309).
机译:目的:提供一种使用结果数据来估算建筑项目的项目费用的方法和系统,以通过基于结果将先前类似项目的费用转换为当前项目费用来估算项目计划阶段的设备成本和建筑成本。先前建设项目的数据并校正时间和单位容量。构成:如果从多个先前项目结果中选择一个项目(S301),则复制所选项目的估计信息(S302)。如果选择了至少一个先前的项目结果,则从所选择的项目的项目结果数据中计算出每个过程的人工和价格的加权平均值,并且创建项目费用申请价格数据库(S303)。通过将所选项目的复制估算信息添加到项目费用申请价格数据库中,可以创建基本估算数据库。共同校正所创建的基本估计数据库以适应所请求的内容和特征(S304)。在完成校正之后,如果估计数据与新项目不同,则将估计数据删除,附加或替换(S305)。替换设备的规格,并且执行设备成本(S307)。对于仅与建设有关的项目,建设成本是正确的,并且估计建设成本(S308)。间接费用在建设项目费用中是正确的(S309)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号