摘要

PURPOSE: Structure of a load test piece for confirming the support force of an inclined large diameter marine pile is provided to test a static axial load about the pile on the sea directly. CONSTITUTION: According to the structure of a load test piece for confirming the support force of an inclined marine pile(11) having a diameter of at least 800mm, an inner pile(12) is inserted within the large diameter pile. A tip end portion(121) and a head portion(122) of the inner pile are closed with a reinforcing plate, and a plurality of stabilizing beams(123) that a roller is attached at the end thereof are fixed to the outer wall of the inner pile in order to minimize a frictional force between the inner pile and the large diameter pile, prevent buckling thereof and maintain a direction of load in a direction of inclination. A hydraulic jack is installed to the head portion of the inner pile to apply a load. The large diameter pile is provided with a reactive member for the hydraulic jack to apply the load to the inner pile by using the hydraulic jack, thereby measuring a tip end support force of the inclined marine pile.
机译:目的:提供用于确定倾斜的大直径海事桩的支撑力的载荷测试件的结构,以直接测试海上桩周围的静态轴向载荷。组成:根据用于确定直径至少为800mm的倾斜海事桩(11)的支撑力的载荷试验件的结构,将内桩(12)插入大直径桩中。内桩的顶端部分(121)和头部部分(122)用加强板封闭,并且在其端部附接有滚子的多个稳定梁(123)被固定到壁的外壁。为了使内桩和大直径桩之间的摩擦力最小,防止其屈曲并在倾斜方向上保持载荷方向。液压千斤顶安装到内桩的头部以施加载荷。大直径桩设置有用于液压千斤顶的反作用构件,以通过使用液压千斤顶将载荷施加到内桩,从而测量倾斜的海事桩的末端支撑力。

著录项

  • 公开/公告号KR100392109B1

    专利类型

  • 公开/公告日2003-07-22

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20010015420

  • 发明设计人 서덕동;이정학;

    申请日2001-03-24

  • 分类号E02D33/00;

  • 国家 KR

  • 入库时间 2022-08-21 23:45:15

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号