首页> 外国专利> BOTTOM UNIT FOR MAKING BRIDGE PIER FOUNDATION BODY AND PROCEDURE FOR MAKING IN RIVER BED DEEP PAD FOUNDATION OF BRIDGE PIERS BILD AS ONE BUILDING UNIT OF FOUNDATION BODY AND REINFORCED CONCRETE BORED PILE UNITS

BOTTOM UNIT FOR MAKING BRIDGE PIER FOUNDATION BODY AND PROCEDURE FOR MAKING IN RIVER BED DEEP PAD FOUNDATION OF BRIDGE PIERS BILD AS ONE BUILDING UNIT OF FOUNDATION BODY AND REINFORCED CONCRETE BORED PILE UNITS

机译:作为桥身和钢筋混凝土桩单元的建筑单元的桥墩深底桩的制作方法以及桥墩深墩桩的建造方法

摘要

the object of the invention is talpelem hu00eddpillu00e9r - ku00e9szu00edtu00e9su00e9remederben substrates (1), which talpelemnek (1) upper and lower plane of an open, ku00e9tvu00e9gu00e9n u00edvesen fitting, prefabricated reinforced concrete (2) is amelyku00f6peny coat, the internal surface (2), (4) for the cu00f6lu00f6pelemek megvezetu00e9su00e9re, al in addition to ul and open tubular pods, which vezetu0151vu00e1z vancsatlakoztatva booths, and the height is lower.as talpelem mantle (1), (2) the height of the shell (2) and the lower plane and the lower plane of avezetu0151vu00e1z (3) on the same plane.the object of the invention is mu00e9gelju00e1ru00e1s hu00eddpillu00e9rek alaptestbu0151l and cu00f6lu00f6pelemekbu0151l egysu00e9gesenkialaku00edtott mu00e9lytu00f6mbalapju00e1nak (m) reinforced concrete construction course, during which amedret were prepared and the prepared talpelemet (1) is placed, and the talpelem (1) vezetu0151vu00e1zu00e1t al butit fu00fclku00e9ken u00e9pu00edtu00e9sivu00edzszintru0151l (v) drilled through the channel betonoznak cu00f6lu00f6pelemeket (4),the upper plane of the betonozu00e1st vezetu0151vu00e1z continue, while the fu00fclku00e9ketbetonnal completely fills, then the vezetu0151vu00e1z internal, central space (6) filled with concrete under water, and the talpelem ku00f6penyu00e9re (1), (2) at least one of the construction water level (v) which extends above the empty of drive (7) is placed in the ring (7), as well as the interior dry munkateret (l) is developed. oh
机译:发明内容本发明的目的是talpelem h u00eddpill u00e9r-k u00e9sz u00edt u00e9s u00e9remederben基材(1),其中talpelemnek(1)上,下表面是开放的,k u00e9tv u00e9g u00eves ,预制的钢筋混凝土(2)是amelyk penny涂层,其内表面(2),(4)除ul和开放式管状吊舱(vezet u0151v)外还用于c u00f6l u00f6pelemek megvezet u00e9s u00e9re talsatlakoztatva亭,其高度较低,如塔佩勒姆地幔(1),(2)壳的高度(2)以及avezet的下平面和下平面( u00)本发明的目的是m u00e9gelj u00e1r u00e1s h u00eddpill u00e9rek alaptestb u0151l和c u00f6l u00f6pelemekb u0151l egys u00e9gesenkialak u00edtott m u00e9ly在此过程中,准备了阿米地雷,并放置了已制成的talpelemet(1),并完成了talpelem(1)vezet u0151v u00e1z u00e1t al b utit f u00fclk u00e9ken u00e9p u00edt u00e9siv u00edzszintr u0151l(v)穿过通道betonoznak c u00f6l u00f6pelemeket(4)钻孔,betonoz u00e1st v的上平面继续,betonoz u00e1st v f u00fclk u00e9kettonnal完全填满,然后vezet u0151v u00e1z内部,中央空间(6)在水下注满混凝土,而滑石k u00f6peny u00e9re(1),(2)至少其中一种建筑用水在驱动器(7)的空位上方延伸的水平(v)被放置在环(7)中,并且内部干燥的芒卡特(l)也被显影。哦

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号