The method of construction for the under ground concrete structure and the construction for the same and the concrete for construction joint part
The method of construction for the under ground concrete structure and the construction for the same and the concrete for construction joint part
展开▼
机译:地下混凝土结构的施工方法,该施工方法及施工缝部分的混凝土
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: A construction method for an underground concrete structure is provided to prevent the permeation of underground water to an underground structure. CONSTITUTION: The construction method for an underground concrete structure comprises the steps of: installing a reinforcement assembly composed of distribution bars(12) installed along a structure and a main reinforcement(11) installed perpendicular to the distribution bars(12); installing a steel grid(30) on an end of each lot(10) of the reinforcement assembly in the same direction to the distribution bars(12); placing primary concrete(13) by lots(10) to make a portion of the steel grid(30) exposed to the outside of the primary concrete(13); after the primary concrete(13) is dried, placing secondary concrete(21) on a joint(20) between a lot(10) and a lot(10) to connect underground concrete structures.
展开▼